Home  |   Our location
 
Projects Undertaken

COMPLETED PROJECTS

1. Client: Ministry of Livestock Development (Leather Development Council)
a) Project: Construction of a Tannery, 50m3 Underground masonry water tank and Reinforced Concrete Frame (For a 20,000 Lts elevated plastic water tank) at Mogotio Township

2. Client: Ministry of Education
a) Project: Construction of Mogotio District Education Office Block
b) Project: Construction and Completion of 1 No. Laboratory at Soy Secondary School, Kerio Valley.
c) Project: Construction of a Class Room and Completion of a Laboratory at Kapweria Secondary School, Trans-Mara.
d) Project: Construction of 3 No. Water Tank Plinths at Kapweria Secondary School, Trans-Mara.
e) Project: Construction of 3 No. Water Tank Plinths at Soy Secondary School, Kerio Valley.

3. Client: Ministry of Local Government- County Council of Koibatek
a) Project: Construction and completion of 2 No. Class rooms at Kapkararam Primary School.
b) Project: Construction and completion of 2 No. Outpatient units at Saos Dispensary.
c) Project: Construction and completion of 1 No. Class room, Gate and Gate-House at Olkokwe Secondary School.

4. Client: Ministry of Roads- Kenya Rural Roads Authority (KeRRA)
a) Project: Gravelling, Culvert & other Drainage Works on a 4 Km stretch on Kaisongor-Kapkochur Road, Elgeyo Marakwet.
b) Project: Gravelling, Culvert & other Drainage Works on a 4 Km stretch on Sisiya-Kapsoy Road, Elgeyo-Marakwet.

5. Client: Ministry of Water and Irrigation (MW&I)
a) Project: Construction of Rotubei Water Intake Structures (Marigat)

6. Client: Excloosive (K) Limited
a) Project: Construction of Wastewater Treatment & Recycling Tank at Rabai Power Plant, Kilifi.

7. Client: Community Development Trust Fund
a) Project: Design, Fabrication & Erection of a 24m3, 12m high Elevated Steel Water Tank at St. Michael’s Secondary School, Soy.
b) Project: Design, Fabrication & Erection of a 24m3, 15m high Elevated Steel Water Tank at Awasi Kakola Sub- Location.

8. Client: Rift valley Water Services Board
a) Project: Construction of Water pans, water troughs, perimeter fence and community water intake points at Keiyo South (Sawe & Kapendich), Keiyo North, (Chepkatui & Chebaiywo), and Pokot South, (Kapetakinei & Tumoi)

9. Client: County Government of Baringo
a) Project: Renovation of The Governor’s Office, Construction of masonry perimeter fence, construction of reinforced concrete frames and slabs, construction of a generator house, construction of gate house and steel gates and renovation of the Restaurant.
b) Project: Fabrication, Construction and Erection of a 36m Span Steel Foot Bridge at Bulioge-Mogotio
c) Project: Completion of Sentry House, Power House, Ablution Block, Perimeter Fence, Electrical Works

Works and Lagoons at Mogotio Tannery
d) Project: Construction of 4 No. Outpatient units and 4 No. Toilets at Mogotio.


ONGOING PROJECTS

1. Client: Kenya Power & Lighting Co. Ltd.
a) Project: Civil Works for Underground Cabling (Rock drilling, Micro-tunneling, Excavation, Ducting, Cable laying and Re-Instatement Works)

2. Client: Adpower Ltd.
a) Project: Construction of Kagumo Sub-station (construction of Cabro paved access roads, construction of reinforced concrete foundations and columns, construction of masonry perimeter walls, construction of septic tank and soak-pit, construction of control room, construction of guard house and a steel gate, construction of concrete lined cable trenches)

FEATURED PROJECTS
August 2015
Kenya Power & Lighting Co. Ltd.
Civil works for Underground Cabling (Rock drilling, Micro-tunneling, Excavation, Ducting, Cable laying and Re-Instatement Works)